Padma bridge design fault in rail, road link yet to be resolved
প্রকাশিত: ২৩ অক্টোবর ২০২০, ০৯:৪১
Bangladesh Bridge Authority (BBA) has rejected the Bangladesh Railway's (BR) revised design of height clearance between approach roads and elevated rail tracks of Padma bridge.
Sources said the BBA c...